Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Phase 1 Samolino Required <br />Assume one sample/month from the heap facilities and 1 year of quarterly <br />sampling at the 10 monitoring stations. <br />49 samples x 5230/sample = $11,270 <br />Phase 2 Samolino Required <br />Assume one sample/month from the heap facilities and 2 years of quarterly <br />sampling at the 10 monitoring stations for final reclamation. <br />96 samples x 5230/sample = 522,080 <br />D. Monitoring Well Abandonment <br />A total of 8 wells will need to be abandoned. <br />Average depth of the wells is 150 feet. <br />Well diameter is an average of 4 inches. <br />To backfill the wells will require a total of 16 yds3 of <br />concrete. <br />Delivered concrete price is E55/yd3. <br />555/yd3 x 16 yds3 = 5880 <br />4 hours labor/well x E5/hour x 8 wells 5160 <br />PHASE 1 TOTAL MISCELLANEOUS COS1S = $71,010 <br />PHASE 2 TOTAL MISCELLANEOUS COSTS = $81,820 <br />L-19 <br />(Revised 4/20/89) <br />(Revised 3!14/89) <br />