Laserfiche WebLink
i~ <br />1 Miscellaneous Costs <br />A. Mobilization/Demobilization <br />Mobilization/demobilization costs are from Jones construction. <br />Costs are based on either $3.75/loaded mile or $55/hour whichever <br />' is cheapest. For the San Luis Project $55/hour is the cheapest since <br />the drive to the site takes approximately 40 minutes. <br />Equipment to be transported to and from the site includes a <br />dozer, scraper, water truck, motor grader, loader, tractor, and 4 <br />I dump trucks. <br />I 10 pieces of equipment x $55fpiece of equipment x 2 = $1,100 <br />B. Road Maintenance <br />Although final site reclamation will take 2 years, actual <br />reclamation work is estimated to take 4 months. the rest of the time <br />will be spent in heap detoxification. <br />A motor grader and water truck will be utilized for 4 hours each <br />day of the 4 month period. <br />4 hours/day x 30 days/month x 4 months x $50/hour = $24,000 <br />' 4 hours/day x 30 days/month x 4 months x $70/hour = $33,600 <br />C. Water Samples <br />1 Water sample costs are based on costs from Core Laooratories. <br />Free cyanide testing is $30/sample. <br />A suite which includes major cations, major anions, pH, <br />conductivity, and 12 major trace metals is $200/sample. <br /> <br />J <br />L-18 <br />(Revised 4/20/89) <br />(Revised 3!14/89) <br /> <br />