Laserfiche WebLink
<br /> ~ <br /> z <br /> .. , . <br />that we mitigate this wetland to their standards. The wetland will be replaced at <br />the at the western-edge of Cell AO as shown in the revised Exhibit F. <br />26. The discrepancy between the pit boundary and the reclamation pond has been <br />• fixed and Exhibit F has been revised. <br />Rule 6:4.7 Exhibit G Water Information <br />' 27. Exhibit G~has tieeh edited to include.a section on Project Water Requirements. <br />A copy of water rights have been included in Attachment G-1 <br />28. The maximum acreage of'pit to be dewatered at any one time will be Cell D (-11 <br />acres). Exhibit G has been updated to include, this information. <br />29. A database search was conducted at the Office of the State, Engineer for wells <br />within 600 ft of the Gardels Pit. There are no alluvial wells within 600 ft of the <br />Gardels Pit. <br />30. Water"table contours based dri 5 observation wells have been added to Exhibit <br />C-1, ,For Cells A-B, the water table occurs at approximately 10-14 ft below <br />ground'surface. ;For Cells C-D, the water table occurs at approximately 12 ft <br />below ground surface • <br />31.. Exhibit C=1' has been edited to include the location of Groundwater seeps. The <br />only,user of this-water is the Gardels Farm. The Gardels Farm owris the water <br />rights to these seeps (Osborn Irrigation. System). <br />•~. <br />32. A groundwater modeling report was prepared for Larimer County Engineering as <br />part of the~Use by Special Review requirement for the Gardels Pit. A copy of the <br />report has.been included"as Attachment G-2 and covers drawdown issues. It is <br />~, predicted that no local water supplies will be impacted by dewafering. <br />• ' 33. A temporary substitute water supply. plan (SWSP) has been submitted to the <br />OSE arid is being reviewed by the OSE's private consultant: This plan will be <br />approved prior 4o excavation below the water table <br />• 34. Pit dewatering effluent will be routed to sediment ponds prior to discharging to <br />the Big"ahompsori River: <br />35, "Exhibit C-~1' has beeh edited to include 2 irrigation ditches. Theses ditches have <br />been hisforically~used to, irrigate the Gardels Farm exclusively." There are no <br />• ~ other ditches within 200 ft of the affected land. <br />36. The Gardels PiY is not within the 100 year floodplain. The limits of the FEMA <br />designateii 100 year floodplain are given in Exhibit C-1 and a copy of the Firm <br />Map has been enclosed. The Larimer County floodplain administrator concurs <br />., <br />that the project is out of the floodplain. <br />'Rule 6.4.10 Exhibit') `-Vegetation Information <br />37. The letterfrom June 4, 2002.has been included <br />ule 6:4.12 Exhibit L -Reclamation Costs • <br /> <br />