<br />9. The haul road between the east pit areas (Cells C-D) and west pit areas (Cells A- <br />B)will occur at the same, location as an existing unimproved road. The haul road <br />will be approximately 15 ft wide and will be graveled with approximately 6" of <br />gravel. The runoff coefficient for a gravel road is not expected to significantly <br />increase local runoff to the point of needing additional drainage structures.. The <br />haul road will cross an existing 12" CMP on the west side near the east corner of <br />Cell A which will„remain. At the request of the landowner, the haul road will <br />remain following mining and will not undergo reclamation as it is considered an <br />improvement to the property., Exhibit D.has been edited to include this <br />information, <br />10. The depth. of cells will be approximately 20 ft. The mining highwall slopes will be <br />approximately 0.5H:1V. Exhibit D has been edited to include this information <br />under Earthwork. <br />' 11. No structures will be constructed onsite <br />12. The overburden'stockpiles will occur in Cell B and Cell C as adjacent cells are <br />stripped for mining. No overburden stockpile will occur in Cells A and D due to <br />` concurrent reclamation of those cells. In other words, overburden will be stripped <br />from Cells B and D and backfilled_directly into Cells A and C respectively. Exhibit <br />C-2 has been edited to show the location of overburden and topsoil stockpiles. <br />. 13. Erosion control for topsoil and overburden stockpiles will be as follows: <br />' ,Experience with other focal mining operations shows that vegetation will <br />naturally; establish on topsoil stockpiles and as such, topsoil stockpiles will <br />be allowed.to naturally re-vegetate. , <br />• The APE,N permit specifies watering of stockpiles to prevent wind erosion, <br />` the stormwater NPDES specifies silt fence at the toe of all stockpile <br />slopes. , <br />Furthermore, overburden stockpiles are expected to be backfilled into <br />adjacent cells in a matter of.months. <br />14. Topsoil and Overburden stockpiles have been re-configured and,Exhibit C-2 has <br />been edited to shoWlocations <br />• -The topsoil stockpile has been moved to provide a 10 ft setback from the <br />pit bqundary in Cells A and B r <br />'• The south boundary of the topsoil stockpile is above the elevations of 100 <br />year floodplain and will not be subject to high water from the Big <br />- . ~ 'Thompson River. Silt fence wilt be placed at the toe of this topsoil <br />stockpile as specified in.the NPDES stormwater management plan. <br />Topsoil stockpiles will, :only occur in pits adjacent to active mining area. <br />Exhibit C-2' has been edited to include when the stockpiles will occur for <br />clarity '. , ,' . <br />~• The location of.the stockpile in Cell Chas been relocated away from the <br />haul road. Exhibit C-2 has been edited to include this information. <br />