Laserfiche WebLink
N • <br />(:olorado Division of Minerals and Geology <br />ESTIMATING FORM -BULLDOZER WORK <br />Task #: 10 Prep. by: 555 Task File Name: M165.10 <br />' Date: 07/28/95 Permit #:M-81-165 Nine: Neglected Mine <br />Permit Action: Sucession of operator <br />Task Description: Regrade upland diversion ditch <br />HOURLY EpUIPMENT GJST <br />= Basic Machine: Cat D6H Horsepower: ERR <br /> Blade Type: Semi-Universal <br /> Attachment #1: RDPS Cab Shift Basis: 1/day <br /> Attachment #2: 3-shank ripper ---'---- <br />Cost Breakdown: <br />---------- Utilization % (code OSU) <br />Ownership cost/hr' = f24.59 N/A <br />Operating 8 overhau l costlhr- dozer = 522.63 100 <br /> -ripper = f0.00 0 <br />Operator costlhr (21.58 N/A <br />Total egpt. unit cost/hr = f68.80 Total fleet cost/hr: f68.80 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 1.334.0 LCY Factor: N/A Volume: 1,334.0 LCY <br />Source of quantity t ake-off: Assume 6' x 3000' ditch ' ~ <br />Source of est. swe'Il factor: NA <br />HOURLY PRODUCTION <br /> b <br />di F <br />t <br /> tion Correction <br />Jo <br />Con ors <br />ac <br />A <br />h di <br />t 50 ft - -- <br />- <br />vg. pus <br />s <br />ance: . - <br /> ---- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.10 (Cat tbl) <br />dozer production: 545 LCY/hr Dozing method..... 1.00 (gen.) <br /> -'-- Visibility........ 1.00 (avg.) <br />Material consistency : Job efficiency.... 0.83 (1 sh/day) <br />Partly consolidated stockpile Spoil pile factor. 1.00 ( PS ) <br />------------- ---- Push gradient..... i.33 (Cat tbl) <br />Avg. push gradient: 15.00 X (neg) Altitude dera tion. 0.98 (Cat tbl) <br /> - Material weight... 0.87 (Cat tbl) <br />Avg. site altitude: 10000 ft. Blade type........ 1.00 (S or U) <br />Material weight 2650.00 lb/LCY Net Job Correction 0.77 <br />Mat. Descr.: - <br />Decomposed rock - 25% Rock, 75X Earth Adjusted Unit Prod.: 421.52 LCY1hr <br /> Adjusted Fleet Production: 421.52 LCY/hr <br />JOB COST <br />Fleet size 1 Dozers) Total Job Time: 3.16 Hours <br />Unit Cost (0.163 /LCY Total Job Cost: 5217.75 <br />