Laserfiche WebLink
lorado Di:;sion of Mine:al`.and Geology • <br />~ ESTINATIN6 FORK - BULLDOZER NORK <br />-------------------------------- <br />Task 1: 9 Prep. by: SSS Task File Name: M165-4 <br />Date: 03%08/95 Permit t:M-81-165 Mine: Neglected Mine <br />Permit Art.ion: Secession of operator <br />Task Description: Regrade road to lower storage pad and waste dumps <br />HOURLY' EOUIPMENi COST <br />_____________________ Basic Nachine: Cat DtiH Horsepower: 165 <br />Blade type: Semi-Universal """"" <br />Attachment A1: RUPS Cab Shift Basis: 1%day <br />Attachment Y2: 3-shank ripper ""`""" <br />Cost Breakdown: <br />""""""" Utilization Y (rode hkm} <br />Ownership cost./fir = 524.59 N/A <br />Operating s overtaul cost/hr- doter = 522.63 100 <br />-ripper = 50.20 1D <br />Operator cast/hr = S21.Sf N(A <br />Total eq-t.. unit costJhr = S69.D1 Total fleet cost/hr: 569.01 <br />MATERIAL OUAtfiiTlES <br />Initial Swell Loose <br />Volume: 216.0 CCY =actor: 1.125 Volume: 310.5 LCY <br />Source of quantity take-off: Assume 15' r 250' road graded to 2' depth <br />Source of est. swell factor: Cat Handbook <br />HOURLY PAODUC1Ii~N <br />_________________ Job Condition Correction Fattors <br />Avg. Push distance: 50 ft. ""•"..,,..".".,..•" ."" „ <br /> """" ` OPerat.or.......... 0. 75 (avg.1 <br />Unadjusted hourly Nat. consistency.. D. 90 (Cat tb11 <br />deter production: 54S LCY/hr Dozing method..... I. OU (gen.) <br /> """" ` Visit~ilitY.•...•.. 1 .00 iavg.) <br />Material ronsisteni.; : Job efficiency.... O. R3 (lsh/daYl <br />i Compacted fill or embankment Transmission type. 1. 00 ( PS <br />.,`."„"`.`..`..,. ..,,'.." ",`.." Grade adJUStment.. 1. 00 (Cat tbl) <br />Avg. Push gradient: 0.00 S (pos! Altitude adj. .... 0. 48 +Cat tt~ll <br /> """"` Naterial weight... 1. 00 iCat tbl; <br />Avg. site altitude: ]0000 f[. Blade type........ 1_ 00 (S or Ui <br />Material weight 2300.00 lh/LCY Net Job Correction 0. 55 <br />Nat. Desrr.: .""`., ` "" .".. .` <br />GENERAL FILL Adjusted Unit Prod.: 29°. 98 LCY%hr <br /> Adjus ted Fleet Production 40. 98 LCr/hr <br />JriB CnST "" "" "' <br />----- --Fleet site 1 Doterls) Total Jab Time: 1. 04 Hm;rs <br />Unit Cost 50.231 /LCY Total Job Cast: S7S. bi <br />