My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27960
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:18 PM
Creation date
11/20/2007 8:43:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981165
IBM Index Class Name
Hydrology
Doc Date
7/31/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(:olorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK - <br />Task #: 11 Prep. by: 555 Task File Name: M165.11 <br />Date: 07/28/95 Permit #:M-81-165 Mine: Neglected Mine <br />Permit Action: Sucession of operator -~ <br />Task Description: Regrade topsoil over all areas disturbed postlaw <br />HOURLY EQUIPMENT COST <br /> Basic Machine : Cat D6H Horsepower: ERR <br /> Blade Type : Semi-Universal -------- <br /> Attac hment #1 : ROPS Cab Shift Basis: 1/day <br /> Attac hment #2 : 3-shank ripper -------- <br />' Lost Breakdown: <br />-------- Utilizati on X (code OSu) <br />Ownership cost/hr 524.59 N/A <br />Operating 8 overhaul cost/hr- dozer = 522.63 100 <br /> -ripper = 50.00 0 <br />Operator cost/hr 521.58 N/A <br />Total egpt. unit cost/hr = 568.80 Total fleet cost/hr: 568.80 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 192.0 LCY Factor: N/A Volume: 192.0 LLY <br />Source of quantity ta ke-off: Assume 10.350s.f. covered w/ 6' topsoil <br />Source of est. swell factor: NA - <br />~ HOURLY PRODUCTION ____ <br /> Job Condition Correction Factors <br />Avg, push distance: 50 ft. - ----- <br /> - Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (Gat tbl) <br />dozer production: 545 LCY/hr Dozing method..... 1.00 (gen.) <br /> Visibility........ 1.00 (avg.) <br />' Material consistency: Job efficiency.... 0.83 (lsh/day) <br />Loose stockpile Spoil pile factor. 1.00 ( PS ) <br />---------- -- Push gradient..... : 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 X (pos) Altitude deration. 0.98 (Cat tbl) <br />~ -- Material weight... 1.10 (Cat tbl) <br />Avg. site altitude: 10000 ft. Blade type........ 1.00 (S or U) <br />Material weight 2100.00 lb/LCY Net Job Correction 0.80 <br />Mat. Descr.: - <br />Earth - Loam Adjusted Unit Prod.: 436.60 LLYthr <br /> Adjusted Fleet Production: 436.60 LCY/hr <br />JOB COST <br />Fleet size 1 Dozers) Total Job Time: 0.44 Hours <br />Unit Cost 50.158 /LCY Total Job Cost: 530.26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.