Laserfiche WebLink
r„ , BASIN RESOURCES, INC. <br />SEDIMENTATION POlID INSPECTION FORM <br />Pond GOLDEN EAGLE NPDES No. 004 <br />Date of Inspection ~_~ ,~ ; . X555- ' <br />~. . <br />EN8J1N1CMEI~TP ~~ <br />1. Adequacy of the vegetative covei: ~Excellent,~~der , Few, Poor <br />2. Erosion forming gullies: Extensive, Sole, Very Few, None <br />ry <br />'• 3. Is wave action causing erosion: <br />On the upstream embankment? 'Iles No~_ <br />• At the principal spillway inlet? 'lea No <br />4. Erosion of the downstream toe of the embankment't Yea No x <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? Yee _ No ~_ If yea <br />could this seepage cause potential instability? Yes No ~ _ <br />Explnin• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yes aC No <br />(~ 2. Is the inlet free of debri^ and restrictive s~atsrial?Yes~No <br />\~ ~ 3. is the discharge outlet iree of restrictive mate:ial? Yes_~No_ <br />4. Is erosion occurring at the discharge outlet? Yos No~_if <br />yeD' <br />~ evaluate the severity: Extensive. Moderate J::st starting Non <br />l~RGENCY SPILLMAY ' <br />1. is the overall emergency spillway system capable of passing <br />design storm discherge? Yes_~No <br />2. Does it appear as iL the emergency'spillway has discharged water <br />since the last inspection? Yes No~(_ <br />3. Is erosion occurring at any section o! the emergency spillway? <br />Yea No~_ Describe the <br />.extent . <br />1. -Has the design storage capacity of the reservoir. been surpassed? <br />Yes No_Y~ If yes, / / <br />explain: CLfgJ~r~ ~f~ r,,,,,,~~/ ny~/,./-~.•/ ,./ + <br />.~,, ~.~ isr , <br />-~`.ti~.' Please add any special comments concerning potential'.Ly dangerous <br />problems on the back of this ^heet. <br />inapector_16~y~~ <br />