Laserfiche WebLink
~• <br />:~ <br />:; <br />l HASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION PORN <br />GOLDEN EAGLE 003 <br />Pond NPDE9 No.. <br />Date of Inspection ~ ~ ~,,.,,~SS __ <br />'~. <br />EMBAN1QiENT <br />1. Adequacy of the vegetative cover: E:cellent,Lf~Iodr~er ~, Pew, Pooz <br />2. Erosion forming gullies: Extensive, Sane,. Very Pew, Ifone~ <br />3. Ia wave action causing erosion: <br />On the upstream embartlanent? Yea No~_ <br />At the principal spillway inlet? Yes No~_ <br />4. Erosion of the downstream toe of the embankment:? Yea No <br />The cause of the erosion is attributed to: <br />5. Ia seepage occurring through the dnm? Yee No~_ If yes <br />could this seepage cause potential instabilityi' Yes No~_ <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yes C Ifo_ <br />2. Ia tha inlet free of debris and restrictive material?Yes~_llo_ <br />~- 3. Is the discharge outlet free of restrictive material? Yes LNo_ <br />• 4. Is erosion occurring at the discharge outlet? Yes No_~Ii <br />yea, <br />,~ 'evaluate the severity: Extensive. Moderate dust starting one_ <br />.~, <br />,' EMERGENCY SPILLMAY ' <br />1. Ia the overall emergency spillway system capable of passing <br />design storm discharge? Yes~~No <br />2. Does it appear as if the emergency'spillway hae~ discharged water <br />since the last inspection? Yes No~_ <br />3. Is erosion occurring et any section of the emerc~ency spillway? <br />Yee No~_ Describe the ' <br />.extent <br />SEDIMENT STORAGE CAPACITY <br />1. .Has the design storage capacity of the.reservoiir bean surpassed? <br />Yee No~_ I! yea, <br />explain• ~ <br />~'~.'~;, Please add any special cosmants concerning potentially dangerous <br />problems on the back o! this sheet. q~' <br />