My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27930
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:16 PM
Creation date
11/20/2007 8:38:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
7/17/1995
Doc Name
2nd Qtr 1995 Inspections
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />_:, ; . <br />~. <br />B115IN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FOAM <br />POnd GOLDEN EAGLE NPDES pO, GE_ 002 <br />Date of <br /> EMBANlQiLNT <br /> 1. Adequacy of the vegetative cover: Excellent,< oderat Few, Poa <br />~,:y 2. Erosion forming gullies: Extensive, Some, Very Few, foi~1 <br />~d <br />• 3. is wave action causing erosion: <br /> On the upstream embankment? Yea No~_ <br /> • At the principal spillway inlet? Yes No X I <br /> 4. Erosion of the downstream toe of the embankment? Yee No~_ <br /> The cause of the erosion is attributed to:_ <br />I <br /> 5. Ia seepage occurring through tha dam? Yee Nom If ye <br /> could this seepage cause potential instability? Yea No~_ <br /> Explain• <br />. <br />~ PR INCIP)1L SPILLM)1Y <br />~.. 1. Is the principal spillway system in working orderT Yes~_Mo <br /> 2. No <br />is the inlet free of debris and restrictive aat:erial?Yes~ <br /> <br />. ~ _ <br />_ <br />~ <br /> 3. _No_ <br />Is the discharge outlet tree o! restrictive mat:erlal? Yes <br />• 4. Is erosion occurring at the discharge outlet? Yea No~•It ' <br />~ <br />. <br />Y yes.. <br />:evaluate the severity: Extensive. Moderate Just starting l~o-' <br /> <br />•~, , <br />;~~ RME RGENCY SPILLM)1Y <br /> 1. Is the overell emergency spillway system capaY>le of passing <br /> design storm discharge? Yes~No <br />:::, . <br />" <br />2. <br />Does it appear as if the emergency'spillway has discharged water <br /> since the last inspection? Yea No~_ <br /> 3. Is eroaioa occurring at any section of the emergency spillway? ~ <br />_ Yes No~_ Describe the <br />• .extent . <br /> SED <br />1. IMENT STORAGE Cl\PACITY <br />Nas the design storage capacity of the reservoir been surpassed;•' <br />~,. <br />~ Yea No ~ if yes, ~ <br />' explnin• { i <br />,= <br />,.;~••.; <br />w:~-:~ <br />~_,,, <br /> <br /> <br />le V <br /> <br /> <br />ase add eny special consents concerning potentially dsngsrous <br />~I <br /> problems on the back o! this sheet. ~ <br /> Inspector .. ~,.~~ <br />`r <br />~ <br /> ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.