Laserfiche WebLink
<br />. BASIN RESOURCES, INC. <br />• SEDIMENTATION POND INSPECTION FORM <br />,r Pond GOLDEN EAGLE NPDES No„ 005 <br />~`:;° Date of Inspection fi~ .~ ~J95i <br />t,,.. , <br />EMBANKMENT -_.. <br />1. Adequacy of the vegetative cover: Excellent ![oderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Vsry Few, Non <br />3. Is wave nction causing erosion: <br />On the upstream embankment? Yes No ~C <br />At the principal spillway inlet? Yea No_~_ <br />4. Erosion of the downstream toe of the embar-]®ent.? Yea No~_ <br />The cnuae of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yee No_,~ If yea <br />could this aeepege cause potential instability? Yes No ~ _ <br />Explain• <br /> PR INCIPAL SPILLMAY <br /> 1. is the principnl apillwey system in working order? Yes~No <br /> 2. Ia the inlet free of debris and restrictive siaterial?Yes~_No <br />~"~: - - <br />~_-~ 3. is the discharge outlet free of restrictive mterial? Yes_~No_ <br />• 4. Ia erosion occurring at the discharge outlet? Yes No .~ i! <br /> <br />,~ yes, <br />evaluate the severity: Extensive Moderate Just starting Non <br />'~ <br /> U RGENCY SPILLMAY ' <br /> 1. Is the overall emergency spillway system capebls of passing <br /> design storm discharge? Yes~No <br /> 2. Does it appear as if the emergency'spillway has discharged water <br /> since the lnat inspection? Yes No~_ <br /> 3. Is erosion occurring at any section of the emerg~eaey spillway? <br /> Yes No~_ Describe the <br /> .extent <br /> SE <br />1. DIMENT STOA1-_GE C_»ACITY <br />Has the design storage capacity of .the reservoir been surpassed? <br /> Yes No X If yes, <br /> explnin• ~ <br />~: ~ ; <br />"^ <br /> <br />~,, <br />~c~ Ple ase add en a cial com:penta concernin garous <br />y pe q potentially den <br /> problems on the back o! this sheet. <br /> ~r~/J/J¢~ ~j /~ <br />Inapector_~~ C/ .f+'~~/~ <br />