My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64748
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:39 PM
Creation date
11/20/2007 8:32:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PART 776 GENERAL REQUIREMENTS FOR COAL EXPLORATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 776.11 (b) Continued. <br />• Except ae provided below, if existing roads or trails are disturbed <br />by the exploration activities, they will be bladed and returned to <br />a condition equal to or better than their condition prior to the <br />commencement of the exploration activities. New or additional <br />roads will be constructed only immediately prior to the drilling <br />operations. At the conclusion of the exploration activity and <br />except as provided below, new or additional roads will be bladed <br />and reseeded. All roads will have water bare and/or culverts <br />installed, if necessary, to prevent excessive erosion. <br />Fire protection will be maintained by keeping all trash and debris <br />from accumulating. Adequate fire extinguishers will be maintained <br />and available at each drilling site. <br />Except as provided below, the drilling sites, at the conclusion of <br />exploration activity, will be cleaned of trash and debris, leveled, <br />• retopsoiled, scarified and reseeded to prevent soil erosion. Upon <br />completion of the necessary surface preparation, the affected areas <br />will be seeded according to the reclamation plan in Section 780.11. <br />The seeding of rehabilitated drill sites and access-road locations <br />will be accomplished in the first favorable seeding season upon <br />completion--during the fall or early spring. The reestablishment <br />of vegetation on drill hole sites and abandoned roads, after <br />exploration activities are concluded, is the planned method to <br />prevent possible soil erosion. <br />Most exploration drilling will be conducted immediately ahead of <br />the surface mining activities described elsewhere in this appli- <br />cation. Where the drill site will be mined through shortly after <br />the conclusion of drilling, reclamation will be accomplished, not <br />as described in this Section, but rather in accordance with the <br />reclamation plan described in Section 780.18. <br />• Because air is the anticipated drilling medium, contamination of <br />water-producing areas, such as streams, springs, stockponds and <br />776-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.