Laserfiche WebLink
<br />The Contractor shall scalp areas where excavation or embankment is to be <br />made. Scalping shall include the removal of material such as brush, roots, <br />sod, grass, residue of agricultural crops, sawdust, and other vegetable <br />matter from the surface of the ground. <br />Method of Measurement <br />201.04 Measurement will be by lump sum. When the bid schedule contains <br />a clearing and grubbing lump sum item, measurement of area will not be <br />made. <br />Basis of Payment <br />201.05 The accepted quantities of clearing and grubbing will be paid for <br />at the contract unit prices as follows: <br />When the bid schedule contains a lump sum item, the lump sum price so bid <br />will be paid and shall be full compensation for clearing and grubbing [he <br />entire project. <br />