<br />203.08 Embankment Construction <br />Embankment construction shall consist of constructing the dam embankments, <br />including preparation of the areas upon which they are to be placed; the <br />placing and compacting of approved material within roadway areas where <br />unsuitable material has been removed; and the placing and compacting of <br />embankment material in holes, pits and other depressions within the dam <br />area. Only approved materials shall be used in the construction of em- <br />bankments and'backfills. <br />Free running water shall be drained from the material before the material <br />is placed on the dam. <br />The type of relative compaction required shall be as called for on the <br />plans or as designated. <br />When embankment is to be placed and compacted on hillsides, or when new <br />embankment is to be compacted against existing embankments, or when em- <br />bankment is built 1/2 width at a time, the slopes .that are steeper than <br />4:1 when measured longitudinally or at right angles to the dam shall <br />be continuously benched over those areas where it is required as the. work <br />is brought up in layers. Benching shall be well keyed and where practical, <br />a minimum of 8 feet wide. Each horizontal cut shall begin at the inter- <br />section of the original ground and the vertical sides of the previous <br />cuts. Material thus cut out shall be recompacted along with the new em- <br />bankment material at the Contractor's expense. <br />Where embankment is to be placed and compacted and end dumping is per- " <br />witted, the slopes of the original ground or embankment shall be deeply <br />plowed or cut into before starting end dumping. <br />Unless shown otherwise on the plans or special provisions, where an em- <br />bankment of less than 4 feet above subgrade is to be made, all sod and <br />vegetable matter shall be removed for the surface upon which the embank- <br />ment is to be placed, and the cleared surface shall be completely broken <br />.up by plowing, scarifying or stepping to a minimum depth of 6 inches. <br />This area shall then be recompacted. Sod not required to be removed shall <br />be thoroughly disked before construction of embankment. <br />Dam embankment of earth material shall be placed in horizontal layers <br />not exceeding 8 inches (loose measurement) and shall be compacted as <br />spec if iced before the next layer is placed. Effective spreading equipment <br />shall be used on each lift to obtain uniform thickness prior to compacting. <br />As the compaction of each layer progresses, continuous leveling and man- <br />ipulating will be required to assure uniform density. Water shall be <br />uniformly added or removed if necessary, in order to obtain L-lie required <br />density. <br />When the excavated material consists predominately of rock too large to <br />be placed in 8 inch layers, the Engineer may permit the material to be <br />placed in thicknesses up to the average rock dimension, but not to exceed <br />3 feet. Placing of occasional boulders of sizes larger than the maximum <br />