Mix No. 1. It is anticipated that final reclamation of this area will occur in 2012, in conjunction with <br />final reclamation at the office/shop facilities area. <br />Access Roads Not Associated With Sediment Pond Abandonment. Several permanent access roads <br />for postmine land use will be retained on the reclaimed landscape. These roads are described in the <br />bonding section of this tab and are shown on the Postmine Contour Map (Exhibit 12-91~ All remaining <br />roads will be reclaimed assuming no bonafide requests are received to leave additional roads. No <br />roads will be left without first receiving Division approval. The road base will be dozed into the cut <br />area, the remaining surface will be ripped, culverts removed, graded, and the site soiled. Reclaimed <br />roads will be planted with the appropriate seed mixes and any shrubs or trees according to the <br />reclamation plan. <br />Sedimentation Ponds and Access Roads to These Ponds. Ponds 002, 003, and PECOCO Reservoir <br />have been approved as permanent impoundments (Pond 002 was approved as a permanent <br />impoundment in CDMG's Proposed Decision and Findings document dated December 31, 7986; <br />PECECO was approved as a permanent impoundment in CDMG"s Proposed Decision and Findings <br />document dated November 10, 1992; and Pond 003 was approved as a permanent impoundment in <br />CDMG's Proposed Decision and Findings document dated June 6, 7997. Appendix 7-6a presents the <br />permanent pond demonstration for Pond 002, the as-built is shown on Exhibit 7-8. Appendix 7-6b <br />presents the permanent pond demonstration for Pond 003; the as-built is shown on Exhibit 7-11. <br />Appendix 7-6g presents the permanent pond demonstration for PECECO, the as-built is shown on <br />Exhibit 7-181. After all other areas have been reclaimed and have undergone the ten-year observation <br />period for determining reclamation success, and assuming there are no bonafide requests to leave <br />other ponds or roads for the future landowner, remaining sediment ponds and associated access roads <br />will be graded, ripped, and soiled. The reclaimed roads and pond sites will be seeded either with Seed <br />Mix No. 1 or Seed Mix No. 2, depending on site characteristics. Shrub and tree plantings will be made <br />if site characteristics and location are appropriate. <br />Bondin <br />Introduction. The purpose of this section is to provide a reclamation cost estimate, with supporting <br />documentation, for determination of a reclamation performance bond for lands disturbed at Peabody's <br />Seneca II Mine. This document will provide information regarding all disturbed lands within the <br />proposed permit boundary. The amount of bond required was developed assuming that the bond <br />would be forfeited at a time when reclamation liabilities are highest within the five-year permit term <br />(1 99 2-1 9961. This condition is most likely to occur at the stage in the mining sequence when the area <br />from which topsoil has been removed is largest and the volume of material to backfill the open pit <br />areas is greatest. <br /> <br />13-50 Revised 12/04 <br />