Laserfiche WebLink
EXHIBIT F <br />SN RECLAMATION PLAN MAP <br />The Reclamation Plan Map is submitted with the following <br />considerations: <br />(1) No phases or timetables for reclamation are shown <br />because the maximum area of mining disturbance <br />will be continuously active. All subsequent mining <br />activity will result in deepening the pit. <br />(2) The final land use for the entire area is as wild- <br />life habitat. <br />(3) Sideslopes of the pit will be reduced to 2:1 except <br />for the south or upstream end, where the slopes will <br />be reduced to 3:1. <br />F-1 <br />