Laserfiche WebLink
' Processing <br />No processing will occur on the site. <br />' Phases of Miningand Reclamation <br />The mining operation will begin following issuance of the permit. It is anticipated that only <br />about 5-9.0 acres will be mined a time. Reclamation will begin concurrently, before the <br />next phase is opened. On the basis of this rate of extraction, the life ofthe operation is <br />estimated to be about 25 years, more or less. <br />1 <br />1 <br />1 <br />1 <br />P.RW.01/1 A'01 <br />PAW. REZ'ISm 01/1)l01 <br />P RW.OL06g1 <br />