My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62690
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:00 PM
Creation date
11/20/2007 7:39:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001010
IBM Index Class Name
Permit File
Doc Date
4/9/2001
Doc Name
ALLISON GRAVEL PIT SPECIAL USE REVIEW APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br />1 Exhibit D-Mining Plan <br />112 APPi.ICATION <br />AI i.ICON AVFL PTI' <br />' COUNTY OF ELBERT, <br />STATE OF COLORADO <br />' The North 1/2 of NW 1/4 Section 2, <br />Township ] Os, Range 59 W <br />' PIT F.A SO A F. <br />Location and Settint=_ <br />' This is an application fora 112 Gravel Pit to mine gravel at a site located in Elbert <br />County The Site itself is vacant rangeland. The area surrounding the site is also vacant <br />rangeland. <br />' ACCESS <br />The Allison Gravel Pit Site is located South of the Town of Matheson Colorado The <br />' North ]12 of NW 1/4 Section 2, Township lOs, Range 59 W. off County Rd. 149. <br />Soil Salvage <br />' Prior to disturbing an azea, the topsoil will be first stripped and stockpiled for use in <br />reclamation. The depth of the surface soil to be stripped will average about 2-3 inches. <br />' Additional information regarding the site's soil resources is provided in <br />Exhibit I- Soils Information. <br />' Stockpiling will occur near the perimeter of the area to be distributed. Tfie Exhibit C map <br />illustrates typical stockpile placement As a stabilization measure, soil stockpiled for longer <br />than one yeaz will be broadcast seeded with a perennial grass species. <br />' 1VlininP Plan <br />' It is plarmed that operations will begin in Area A as indicated on Pre-Mining and Mining <br />Plan Map Exhibit C. This operation is expected to be a dry mining operation. <br />' The gravel will first be ripped with a dozer and either pushed directly into a stock pile or <br />loaded with afront-end loader into haul trucks for transportation to roads in the <br />surrounding area for road repair. It is anticipated that the site will be mined less than two <br />' hundred (200) days per year. <br />' PRW owaoi <br />PR.W.0.E\'LSPD OI/I]NI <br />PAW.01A16'01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.