Laserfiche WebLink
<br /> <br />AREA El~~. <br />LOCATION: To the south of the current mining area and north of the <br />Fountain Mutual Ditch. <br />AREA: 8.35 acres. <br />CONDITION: Currently being rehabilitated. <br />REHABILITATION: Backfill the former excavation on the west side of the <br />area (this has already been completed). Push the west half of the <br />linear soil stockpile south of the mining area primarily to the north <br />and west from the stockpile. Push the soil stockpiled along the <br />Fountain Mutual Ditch northward to merge with the former location of the <br />linear stockpile and the hole backfilling on the west side of this area. <br />TIMETABLE: Complete prior to March 1, 1992. Seed by March 15, 1992. <br />AREA 5E: <br />LOCATION: The most easterly disturbance area. <br />AREA: 2.27 acres. <br />CONDITION: Completed with rehabilitation other than seeding. <br />REHABILITATION: IIsing a dozer and the existing material on site, the <br />existing excavation was backfilled and topsoil was spread over the <br />entire area. Seeding needs to be done. <br />TIMETABLE: Seed by March 15, 1992• <br />AREA W: <br />LOCATION: Northwest corner of the permitted land west of Academy <br />Boulevard. <br />AREA: 20.99 acres (zone 1= 3.87 acres; zone 2= 8.23 acres; zone 3= <br />3.04 acres; zone 4= 5.85 acres). <br />GENERAL DESCRIPTION: This area is divided into four zones that more or <br />lees represent different types of disturbance and different, but related <br />and integrated, treatments. Each zone is described below. Then a plan <br />describing how each of these zones will be integrated in the reclamation <br />is provided. <br />ZONE 1: (3.87 acres) This zone primarily includes topsoil <br />stockpiles and is adjacent to the north permit boundary. These <br />stockpiles will be moved during the reclamation. <br />Sanuary 21, 1992 Disturbance Reduction Plan M-73-007 Page 3 <br />