Laserfiche WebLink
<br />`J <br />Drainage Control - <br />Undisturbed Area 9A <br />Undisturbed Area 9H <br />Undisturbed Area 14 <br />V-ditch on inslope. <br />culvert TA-3 at 12B. <br />The V-ditch conveys drainage to <br />Segment 13 (13A to 13 B): <br />Drainage Area - Undisturbed Area 14 down gradient of the cu lvert at <br /> 12B. <br />Drainage Control - Outside Berm. The runoff calculated for entire <br /> Undisturbed Area 14 is below output limits for the <br /> SEDCAD+ model. Therefore, to ensure that any drainage <br /> from the area down gradient of culvert TA-3 is <br /> controlled the outside berm will be maintained at a <br /> minimum of 1 ft. <br />C-Transfer Road (AA to BB): <br />Drainage Area - Undisturbed Area 10 <br />Drainage Control - Outside Herm. The runoff calculated for entire <br /> Undisturbed Area 1 is below output limits for the <br /> SEDCAD+ model. Therefore, to ensure that any drainage <br /> from the area is controlled the outside berm will be <br /> maintained at a minimum of 1 ft. <br />Segment 14 (14A to 14B): <br />Drainage Areas - <br />Disturbed Area 7 <br />Undisturbed Area 23 <br />Disturbed Area 8 <br />Disturbed Area 4 <br />Disturbed Area 11 <br />Undisturbed Area 24 <br />Undisturbed Area 25 <br />Undisturbed Area 26 <br />Disturbed Area 10 <br />Undisturbed Area 5 <br />Undisturbed Area 6 <br />Undisturbed Area 7 <br />Undisturbed Area 8 <br />• 3.SF-10 May 14, 1993 <br />