Laserfiche WebLink
Undisturbed Area 1 <br />• Disturbed Area 1 <br />Undisturbed Area 2 <br />Undisturbed Area 3 <br />Spoil Area 1 <br />Spoil Area 2 <br />Undisturbed Area 4 <br />Undisturbed Area 9A <br />Undisturbed Area 9B <br />Undisturbed Area 14 <br />Undisturbed Area 10 <br />Undisturbed Area 16 <br />Undisturbed Area 17 <br />Undisturbed Area 20 <br />Disturbed Area 5 <br />Drainage Control - V-ditch on inslope. V-ditch transports drainage to <br />culvert TA-S and TA-6 (below Goat Trail terminus) to <br />the tipple sediment ponds. An outslope berm is also <br />• provided to carry road surface drainage to the lower <br />office facility ditch and over to the tipple sediment <br />ponds via culvert TA-7. <br />• 3.5F-11 May 14, 1993 <br />