Laserfiche WebLink
<br /> <br />~DW <br />~S~ What is the name of the county road that accesses the permit area? Name the road on your <br />(~ plan map, and if it is within 200 Feet of the proposed affected land list it as such in the <br />appropriate exhibit, and describe how it will be protected from damage by the mining <br />operation. Is this road the same existing road you mention that will be upgraded to two-way <br />traffic from the property boundary to the processing plant? <br />QaSQ ~`Y~~Please provide the same information for the culverUroad crossing of Tallahassee Creek for <br />!~~ f yL the Sandstone Quarry as was requested for item 3 above. If this structure is in the creek <br />dZ~x¢`~~~ channel and requires Army Corps of Engineers approval, provide the Division a copy of the <br />~ i~ plans and specifications, as provided to the Army Corps. <br />~t f <br />~Ug ~ ~14."~ Please provide the Division a copy of your approved Stormwater Management Plan required <br />t~t~~ ~ as part of your Storirtwater Discharge Permit. <br />~V~ ~~.{ <br />1~~/1r8. Y h ttdh fh d d 'llb d dlf' 1 <br />~~~~~:~ <br />~~,,~~..yy~ vw <br />~~s 8"~~. 19. <br />ou ave s a e tat portions o t e constructe roa s wi a maintaine an e t in p ace <br />following mining to provide access within the ranch." Provide detailed information <br />regarding what road portions will remain and what portions will be reclaimed upon the <br />completion of mining. <br />Please provide plans for construction of the rail lines. Of particulaz interest to the Division <br />is the source and type of material required for construction grade fills and typical cross <br />sections of the fills. Please also provide information regarding any cuts that are necessary <br />for construction of the rail lines dimensions, slopes, etc. <br />e ~,YJ . <br />~p~ F p ~,,~ Your plan states that "process water will be pumped from a well to be located in the process <br />pidd~i~k-"„y~ lant azea" Do you have a permit from the Division of Water Resources for this well? You <br />~ UU~tI ~t S'1{'~P~~will need to demonstrate to the Division that you have a legal right to adequate water <br />r~ ~l'YL p re u ce for your,pro osa minx gpera t ~y <br />r` t0 St~~we~Ter1'-~h4i~,r~`~iF~~~ i~ir.~fa.'lc.~~.i'°"~i~dR~R~ o~o~, <br />~ ~ e fct • I'rv~. ~,,, ~7tNris.,.~G • t T- o ~ ~wc~ < iii ~1llw~ •w-,~yc,I <br />~~ Please show on th~Mining Plan Map, the ocation of the temporary diversions and level OO .. <br />fe ~ spreaders mentioned in your sectioti 1(e), and provide plans and specifications for these <br />I~yf~~I~ features. In this section you also mention the use of sediment basins and check dams as <br />~„µL ~ temporary stormwater stabilization practices. If these features are different from those <br />mentioned in your sections 1.2 Granite Quarry and 1.3 Sandstone Quarry, please show them <br />on the Mining Plan Map and provide plans and specifications for them. You can provide the <br />plans and specifications by providing a typical plan and set of specifications for these types <br />of structures, if they will all be similar in size and construction. <br />t pt'vf ~ 0 Your list of permanent stabilization practices includes "possibly construction of permanent <br />FG U ~~ check dams." You must decide whether these dams will be a permanent part of site <br />fJW'Q reclamation to pasture land. Regardless you must locate them on your Mining Plan Map and <br />provide at least typical plans and specifications for them. If they are to remain after mining, <br />a/ show them on your reclamation plan map. <br />f~ <br />p aSQ~~ 23. What is the depth to ground water in the area of the gravel pits? <br />I" 1 <br />4 <br />