Laserfiche WebLink
<br />You can leave these units on the maps if you wan[ to declare that they are also part of the <br />mining plan and you address these areas appropriately in all other necessary exhibits. <br />~~~rag <br />7~L Not all of the land within the permit boundary will be affected land. Refer to the defini[ion <br />A~{' ~ of affected land and delineate affected land boundaries that can be marked in the field in <br />11`` ~,p, accordance with Rule 3.1.12. To accomplish this you may want to enlarge you map scale to <br />"~ effectively show the dimensions of land affected by roads, railroads, etc. <br />8. ~y/f.tC map in this exhibit titled "Soil Salvage Units" shows a salvage unit E which is nearly <br />4 Cy' entirely outside of areas you have shown to be affected by other mining operations. If you <br />1` P- intend to salvage soil from this unit, you must include it in the affected land's boundary and <br />.' include the treatment of this area in all other appropriate exhibits. The same holds for <br />portions of salvage unit D. Please explain the salvage unit boundaries. <br />EX/~HIBIT D - Minin¢ Plan <br />1. p3p~four introduction states that "disturbed sites will be graded to be free-draining to small <br />Ret d ~ sew nt ponds which will dischazge via infiltration and through check dams. '' T~ <br />~~ Dtvision assumes that these ponds and check dams aze separate su ac`rT e~/erosion control <br />structures from those described in your section 1.6. Please show the location of these ponds <br />on the Mining Plan Map. Provide plans and specifications for the construction of the ponds, <br />and pr9vide their capacities. ~r 4-C ~`P ~"'~''•~ . <br />~~ 0(tili'our section 1.1. states that berms and ditches will be used to protect Tallahassee Creek <br />Cw~d' ~.~I from uncontrolled runoff from mining operations. Will the berms and ditches divert water <br />oK}}~Y ~ ~,t f down gradient to an outlet location? If so what will they outlet to? Provide plans and <br />l,e~) v~~ a~rPtff pecifications for these berms and ditches and show their location on a Mining Plan Map of <br />\~' ~`~,~ufficient scale to delineate them. <br />N~tl 3. r~oYour section titled "Granite Quarry" states that a combination rail and haul road crossing of <br />R,f~ k Tallahassee Creek will be constructed to the Granite Quarry. Provide plans and <br />specifications for this crossing including the size and number of the culvert or pipes to be <br />~~/rt"~ 'stalled and plans for installing rip-rap. Provide information showing the watershed area- <br />~¢~ ~c d calculate peak flow of the 100-year storm event. Also provide a discussion of how the <br />ot!'U ' f ~ installation can be accomplished to minimize impact on brown trout assa~e and spawning. <br />l~.,l~ ou should consult with the Division of Wildlife. ~` <br />PP,i...iV n11/I <br />t~t~. ~V i <br />~f ~ Your plan includes small sediment ponds to control erosion. Please provide plans and <br />~atQ~"~~ lpecifications for their installation. Be sure to include information on the size of the <br />,~~,../~,~, ructures and their capacities. Will these structures be removed upon reclamation? <br />i5. fh~~Will the granite Granite Quarry haul roads to and from the upper benches be within the <br />R~~~r~jN,affected land boundary? Show the location of these roads on the Mining Plan Map. <br />6. Ot'`t ill the rock processing equipment at the Granite Quarrv be portable or will it be mounted <br />Rb,~ ri foundations or footings? If any concrete structures over a few cubic yards will be <br />