Laserfiche WebLink
DATE: September 9, 1997 <br />TO: Mr. Mitch Albert ~~~ <br />FROM: Larry D. Oehler, Environmental Protection Specialist <br />RE: File No. M-97-054, Adequacy Items <br />The following items must be addressed by the applicant in order to satisfy the applicable <br />requirements of C.R.S. 34-32.5-101 et seq. and the Mineral Rules and Regulations of the Mined <br />Land Reclamation Board: <br />EXHIBIT C -Pre-Minine and Mininc Plan Mans of The Affected Lands <br />1. You have mazked the permit area boundary with a heavy dazk line on your Pre-Mining Plan <br />rrr v~f C ~ Map. In accordance with Rule 6.2.1(d), identify the line either on the map or the map index. <br />`3~ • The Pre-Mining Plan Map should be relabeled Pre-Mining/Mining Plan Map since it shows <br />the mining operation as well as pre-mining conditions. This information can also be <br />provided on two sepazate maps. <br />2.~,,,~C Please identify the owner of the lands immediately south of the proposed permit boundary <br />{rf~~(aM and within 200 feet of lands to be affected by the mining operation. This is the land on the <br />~~. Pre-Mining Plan Map displaying no ownership symbol and lying along the route of the <br />+ (~ Arkansas River between land belonging to Mazk Brown and the east map boundary. <br />~4+~ Are there any utilities located in the r lroad ght-of-w y? If so provide inform io in <br />O ~ appropri~atAerexhibits. ~e~ ~^`~r`~f ~~ ~` `~ a~ ~K EX.~i j~ ~~ s. <br />4. fe Are there any wells located in the proposed permit area or within 200 feet of the affected <br />r~t~0~' ti~~jj land boundary? If so, show them on a revised "Pre-Mining and Mining Plan Map:' <br />`~.r'.~' <br />5 '- Your Pre-Mining Plan Map shows estimated maximum floodplain boundaries for <br />t~;;~'~ Tallahassee Creek; however, there is no explanation in the application of what level of storm <br />'7 event the boundaries are for. Fora 112 permit application the 100-year flood plain must be <br />;'~ r Yffelineated, if there is some concern that a portion of the operation may be within the <br />~~ ~; floodplain. if a generally acceptable hydrologic method was used to determine the <br />floodplain boundary, please provide it in Exhibit G, with documentation to support the <br />location of the boundaries. Please mark the 100-year floodplain boundary on this map if you <br />have not done so. <br />~a„rP Please be aware that Gravel Expansion Blocks 1 and 2 and Quarry Expansion Blocks 1 and 2 <br />~1 ~~ are not considered to be a part of this application. For the sake of clarification and to reduce <br />~,1 confusion in the future, please remove them from the Pre-Mining and Mining Plan Map. <br />