My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61309
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:56 PM
Creation date
11/20/2007 7:07:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Permit File
Doc Date
3/14/1980
Doc Name
RESTATED APPLICATION FOR MINING & RECLAMATION PERMIT SNYDER QUARRY CASTLE CONCRETE CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fair wildlife habitat. It is hard to predict what land uses would <br />e;:ist 75 years from now, bnt it is certain they will be c.ifferent from <br />• present conditions unless the greater Colorado Springs area population <br />stops growing. <br />BASIC RECLAMATIOPI SEQUEtdCE - Castle Concrete Company will be responsible <br />for reclaiming all the disturbed lands incl~zded in this permit and in <br />accordance with the plan set forth below. <br />The reclamation timetable indicates the sequenca and timing of <br />reclamation events. It is evident from the timetable that wherever <br />reclamation can be done during the course of mining such will be done. <br />F.eclamation will not closely follow mining, but will be determined by <br />the utility of the site in the mining process. Reclamation will at <br />times take on a patchy appearance but in the end it will till be drawn <br />together into a final, overall reclamation. <br />• The noise and sight berm will he the first area to be <br />reclaimed with revegetation on the outer slopes and the top of the <br />berm. The inner slopes of the berm will he revegetated in about 10 <br />years when mining activity is nearly completed. The berm area will also <br />serve as an e~:perimental area to prove the feasibility and detect any <br />problems in the revegetation process. It is the most severe site in <br />the mine and if the procedures will work there they will work anywhere <br />else on the quarry site. <br />Reclamation of the terraces begins in about 7 yews and will <br />continue to the end of the operation. This will be quite patchy, but <br />generally will proceed from the upper terraces to the lower= terraces <br />~~~ithin the pit. <br />• The reclamation of the 123 foot high visibility ~irea (sight <br />reclamation) on the north and the northwest sides of the p:_t will <br />begin in about 7 years. Completion of this in 10 to 12 ye~irs will help <br />S-t-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.