Laserfiche WebLink
<br />8. Please specify what water source will be used to fill the pond and document that use of this <br />water source will not cause injury to any other water rights. Without this documentation DMG <br />will bond for revegetation of the entire site as rangeland. <br />9. Please specify how refuse and acid or toxic forming materials will be handled if exposed during <br />mining. <br />10. Please indicate if the entire affected area will be sloped slightly toward the pit to ensure that <br />no stormwater is discharged from the site. <br />P <br />1 1 .It is assumed that no processing of this material is required. Please verify this assumption. <br />12. Please verify that there are no secondary or incidental commodities to be mined in addition to <br />the topsoil. <br />Exhibit D -Reclamation Plan <br />13.It is assumed that no overburden will need to be replaced at this operation. Please verify this <br />assumption. <br />14.It is assumed that all areas to be revegetated will be deep tilled to break up the soil prior to <br />seeding. Please verify this assumption. <br />15.It is assumed that mulch will be certified weed free hay or straw applied at a rate of 1.5 tons <br />per acre and crimped into the surface. Please verify this assumption. <br />16.Contrary to your statement, the soil tests indicate that an application of nitrogen is necessary. <br />It is assumed that a fertilizer that provides 135 pounds per acre of available nitrogen will be <br />applied to areas to be revegetated. Please verify this statement and specify what fertilizer is <br />proposed to be utilized. <br />17. Please specify if seed will be applied by drill or broadcast seeding. <br />18. Please provide the percentages of pure live seed for each species contained in the Better <br />Homes and Gardens High Traffic grass seed mixture and specify how many pounds per acre of <br />this mix are proposed to be planted. <br />19. Please specify how the trees will be planted and maintained to maximize potential for <br />successful establishment. <br />20.DMG will calculate the reclamation cost estimate upon receipt of B & D Trucking's response to <br />this adequacy review. This estimated amount will be used to determine the amount of <br />financial warranty that is required to be submitted by B & D Trucking. <br />21.Please indicate how water will be directed to and from the finished pond and illustrate this on <br />the reclamation map. <br />