My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60949
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:41 PM
Creation date
11/20/2007 6:57:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
6/9/2003
Section_Exhibit Name
Exhibit 25 Hydrologic Monitoring Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes: NPDES Discharge Points 001 and 003 were associated with Sedimentation <br />Pond No. 1 and Freshwater Pond No. 3, respectively. These ponds have been <br />removed and reclaimed and the discharge points eliminated. <br />Locations of surface and ground water monitoring sites are shown on the <br />Southfield Reclamation Plan Map, (Map 33) <br />B. Samolino Frequency and Procedure <br />1. Selected water quality parameters and flow will be measured weekly during <br />periods of alive discharge <br />2. Water quality samples will be collected monthly if discharge is occurring <br />C. Sampling_Procedure <br />1. The following information will be provided on each sample bottle label: <br />- Station/Well designation <br />- Date and time <br />- Bottle number <br />- Analysis code <br />- Individual's initials <br />2. Samples will be collected in such a manner as to minimize physical <br />disturbance at the sample point. <br />3. Sampling devices will be cleaned prior to use and samples will be placed in <br />clean sample containers which will be sealed at the sampling site. <br />4. Samples will be placed in a cooler with ice immediately after collection and <br />will be shipped within 24 hours to a laboratory for analysis. <br />5. Weekly water quality sampling will included measurement of pit and <br />collection and analysis of grab samples for settleable solids. If there is a <br />visible sheen either on the pond surface or downstream from the discharge <br />point grab samples will also be analyzed for oil and grease. <br />6. Monthly water quality samples will be analyzed for TSS and total iron. <br />D. Data Processing and Reoortino <br />1. Copies of field and laboratory data sheets will be sent quarterly to the <br />Colorado Department of Public Health and Environment (CDPHE) and the <br />CDMG <br />2. If water quality analysis results indicate a possible permit violation, the <br />CDPHE and CDMG will be notified immediately. In addition, both agencies <br />will be provided with copies of the suspect analysis results and a report <br />discussing any necessary mitigation. <br />MR-50 3 Revised -June 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.