Laserfiche WebLink
3. Data will be summarized in the annual hydrology report to the CDMG. <br />III. Groundwater Samolinq <br />A. Monitorino Sites Deoth Completion Interval <br />MW-16 136' 106' - 136' <br />MW-23 179' 149' - 170' <br />MW- 65 1448' 968' - 98$' <br />MW-NW 380' 360' - 380' <br />Notes: Locations of surface and ground water monitoring <br />Southfield Reclamation Plan Map, (Map 33). <br />Completion Zone <br />Jack O'Lantern <br />Coal Seam <br />Red Arrow Coal <br />Seam <br />Jack O'Lantern <br />Seam <br />Red Arrow Coal <br />Seam <br />3 sites are shown on the <br />The monitoring sites MW-7A, MW-7B, MW-8, MW-10 and MW-22 were originally <br />included in the monitoring program. These wells have been intercepted by <br />underground mining activities or have caved and have been eliminated from the <br />monitoring network. <br />B. Samolino Freouency and Procedure <br />1. Water level measurements will be taken semi-annually at each monitoring <br />well. <br />2. Water quality samples will be collected and analyzed semi-annually. <br />C. Samolino Procedure <br />1. The following information will be provided on each sample bottle label: <br />- Station/Well designation <br />- Date and time <br />- Bottle number <br />- Analysis code <br />- Individual's initials <br />2. Samples will be collected in such a manner as to minimize <br />physical disturbance at the sample point. <br />3. Sampling devices will be cleaned prior to use and samples will <br />be placed in clean sample containers which will be sealed at the <br />sampling site. <br />4. Samples will be placed in a cooler with ice immediately after <br />MR-50 4 Revised -June 2003 <br />