Laserfiche WebLink
laboratory for analysis. <br />5. Samples will be analyzed for the following parameters: <br />Suooested Water Oualitv Parameters* <br />pH (field) Phosphate (P03a as P) <br />Conductivity at 25°C (field) <br />Temperature (field) <br />Total Suspended Solids <br />Total Dissolved Solids <br />Oil and Grease (visual) <br />Sodium Adsorption Ratio <br />Bicarbonate (HCO"3) <br />Calcium (Ca'Z) <br />Chloride (CI") <br />Magnesium (Mg'Z) <br />Nitrate -Nitrite <br />Selenium (Se) <br />Sodium (Na') <br />Sulfate (SOq ) <br />Iron (Fe} <br />Manganese(Mn) <br />*Total species concentration (dissolved and suspended) From CDMG <br />Guidelines for the Collection of Baseline Water Quality and Overburden <br />Geochemistry Data. <br />II. <br />D. Data Processing and Reporting <br />I. Copies of the Feld and laboratory data sheets will be sent semi- <br />annually to the CDMG. <br />2, Data will be summarized in the annual hydrology report to <br />CDMG. <br />Sedimentation Pond Discharge Samplino (CDPS) <br />A. Monitoring Locations <br />Discharge Point 002 (Mine) at outlet from Sedimentation Pond No. 4 on <br />tributary to Newlin Creek <br />CDPS Discharge Point 004 (Mine) at outlet from Sedimentation Pond No. 5 on <br />tributary to Newlin Creek <br />CDPS Discharge Point 001 (Loadout) at outlet from Sedimentation Pond L-1 <br />on Chandler Creek <br />CDPS Discharge Point 002 (Loadout) at outlet from Sedimentation Pond L-2 <br />on Oak Creek <br />MR-50 2 Revised -June 2003 <br />