My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60919
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:39 PM
Creation date
11/20/2007 6:56:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Permit File
Doc Date
5/24/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimatinrr Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br /> <br />Task q : 002 Stale : Coloratlo PermiVjobp : M-1999-117 <br />Date: OYf92000 County:Saguache Ahhreviation :none <br />User : RCO Sile :Colorado Gravel Products Pit Filename : M117-002 <br /> <br />Permit or other job action :New application - (nal reclamation <br /> <br />Task description :Grade site where debris was removed (concrete, wood, metal) <br /> <br />HOURLY EQUIPMENT COST Basic machine : Caf DBN (1996) Horsepower : 2B5 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shill hasis : 1 per tlay <br /> Attachment no. 2 : 3-shank dpper <br /> Utilization Y Cosl data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : E41. f0 NA <br /> Operating cesUhour : E55.fi4 100 <br /> Ripper op. casOheur: E0.00 0 <br /> Operator cost/hour: E23. 12 NA <br /> Total unit cosVhour: E119.8fi Total geet cosUhour: $119.86 <br />Initial Svrell Loose <br />volume: 880 CCY (actor: 1.125 volume: 990 LCY <br />Source of quantity lakero6: 2 ac x 6 In deep <br />Source of est. swell factor : Na <br />Average push distance : 100 feet <br />Unadjusted hourly production : 803 LCY/hr <br />Material consislenry description <br />Comoacfed fill or embankment <br />Average push gradient : 0.00 % (post <br />Average site altitude : 7,690 leet <br />Material weight : 2,550 Ibs/LCY <br />Malarial weight description <br />Earth - Orv oacketl <br /> <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency: 0.90 (Ca1HB <br />Dozing method : 1.00 (gen.) <br />Visibility: 100 (avg.) <br />Job eKcienry : 0.83 (15hiNda <br />Spoil pile: 0.80 rrntl-rQ <br />Push gradient : 100 (Cal HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.90 (Cat HB <br />Blade type: 1.00 (S orU <br />Nel correction : 0.40 <br />Adjusted unit production : 324.67 LCY/hr <br />Adjusted Oeet produttion : 324.67 LCY/hr <br />JOB TIME AND COST <br />Fleet srze ~ 1 Dozers) <br />Unit cost : E0.369 /LCY <br />Total job time : 3.05 Hours <br />Telal job cost : $365 <br />
The URL can be used to link to this page
Your browser does not support the video tag.