My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60919
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:39 PM
Creation date
11/20/2007 6:56:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Permit File
Doc Date
5/24/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> Agency or organization name :OMG <br /> <br />Task # : OOJ Slate . Colorado ParmiVjobp : M-1999-117 <br />Date : 0 5/1 92 0 0 0 County : Saguache Abhreviation :none <br />User : RCO Sile :Colorado Gravel Protlucts Pit Filename : M717-003 <br /> <br />Perm it or other jab action :New application -final reclamation <br /> <br /> Task description :Grade process area and belching area <br /> <br />HOURLY E QUIPMENT COST Basic machine :Cat DBN (1996) Horsepower : 285 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no 2 :3-shank upper <br /> Utilization % Cost data source : (CRG) <br /> Cost Breakdown : Ownership cosUhour : 841. f0 NA <br /> Operating cosllhour: $55.64 100 <br /> Ripper op. casOhour: $0.00 0 <br /> Operator cost hour: 823.72 NA <br /> Total unit cosghour : 5719.86 Total Oeel cosUhour : $119.88 <br />MATERIAL QUANTITIES <br /> <br />Initial Swell Loose <br />volume: 3,520 COY factor: 1.725 volume: J,960 LCY <br />Source of quantity lake-oft : 6 ac X 6 in <br />Source of est. swell factor : Na <br />HOURLY PRODUCTION <br />Average push distance: 200 feel <br />Unadjusted hourly produclipn : 448 LCY/hr <br />Material consistency description <br />Compacted 011 or embankment <br />Average push gradient : 0.00 % (pos/ <br />Average site altitude : 7,690 )eel <br />Material weight : 2,550 Ibs/LCY <br />Material weigh) description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) <br /> <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency: 0.90 (Car HB <br />Dozing method : 1.00 (pen./ <br />Visibility: 1.00 (avg.) <br />Job eFicienq: 0.B3 (7shiNtla <br />Spoil pile : 0.80 (Ind-r0 <br />Push gradient : 1.00 (Car HB <br />Altitude: 1.00 (Car HB <br />Material weight : 0.90 (Car HB <br />Blade type : 1.00 (S or U; <br />Net correction : 0.40 <br />Adjusted unit production : 180.99 LCYihr <br />Adjusted Oeet production : 180.99 LCY/hr <br />Total job time : 21.88 Hours <br />Unit cost : 40.662 /LCY Total job cost : $2,822 <br />
The URL can be used to link to this page
Your browser does not support the video tag.