My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60919
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:39 PM
Creation date
11/20/2007 6:56:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Permit File
Doc Date
5/24/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br /> <br />Task # : 001 Slate :Colorado PermiVjobll : M-1999-117 <br />Dale : OY792000 County : Saguache Abbreviation :none <br />User : RCO Sne :Colorado Gravel Proo'ucls Pir Filename : M717-001 <br /> <br />Permit or other job action : New application -final reclamation <br /> <br />Task description : Redu0e highwall fo J:1 <br /> <br />HOURLY EQUIPMENT COSY Basic machine: Cat DBN (1996) Horsepower: 2B5 <br /> Blade type' Semr-Universal <br /> Adachmenl no. 1 : ROPB Cab Shill hasis : 1 per tlay <br /> Attachment no. 2 :3-Shank ripper <br /> Utilization % Cast data source : (CRG) <br />Cost Breakdown : Ownership cosVhour : Y41. f0 NA <br /> Operating cosUhaur : Y55.64 100 <br /> Ripper op. cosOhour: Y0.00 0 <br /> Operator cosUhour: Y23. /2 NA <br /> Total unit cosUhour: Y/19.86 Total fleet cosUhour: $119,$6 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 800 CCY <br />Swell Loose <br />)actor: 1.215 volume <br />Source of quantity take-og : Reclamation <br />Source of est. swell factor : Na <br />HOURLY PRODUCTION <br />Average push distance: 60 teal <br />Unadjusted hourly production: 1078 LCYIhr <br />Material consistency description <br />Comoacletl811 or emhankmenf <br />Average push gradient : 20.00 % (negJ <br />Average site altitude : 7,690 feet <br />Material weight : 3,300 Ihs/LCY <br />Material weigh) description <br />Decomoosed rock - 75% Rock. 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : Y0.250 )LCY <br />972 LCY <br /> <br />Operator skill : <br />0.75 Source <br />(avg./ <br />Material consistency : 0 90 (Cat HB <br />Dozing method : 1.00 (gen.J <br />Visibility: 1.00 (avg./ <br />Job elgcianry: O.B3 (1shiNtla <br />Spoil pile : 0.80 (Ind-rn <br />Push gradient : 1.43 (Cat HB <br />Altitude : 1.00 (Caf HB <br />Material weigh) : 0.70 (Caf HB <br />Blade type : 1.00 (S or UJ <br />Net cerreclion : 0.45 <br />Adtusled unit production : 480.70 LCY/hr <br />Adjusted Beet production : 480.10 LCY/hr <br />Total joh lime : 2.02 Hours <br />Total job cost : $243 <br />
The URL can be used to link to this page
Your browser does not support the video tag.