Laserfiche WebLink
RECLAMATION LOS~MMARY cont'd s~ 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Yask Description ~ Cost (5) <br />n/a <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description ~ Cast (5) <br />6 ~ Wellhead sealing (domestic uell): casing cut off ~ 5300 <br />clean bac kfil 1, grouted shut. <br />Subtotal (L): 5300 <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. <br />____ <br />__ <br />__ <br />~____ Task Description <br />___ <br />____ <br />___ <br />_ <br />_ <br />_______ ~ Cost (E) <br />_____ <br />_ <br />I <br />____ <br />16 _ <br />_ <br />_____ <br />________ <br />_ <br />_ <br />_____ <br />~ Weed control: 5 ac x 550/ac x 4 sprays I____ <br />_ <br />_ <br />~ E1, 000 <br />5 ~ Demolition most debris buried onsite. ~ 511,492 <br />14 ~ Seeding per plan, assume 207. failure. ~ 814,908 <br />9 ~ Fencing steel posts, 4-strand, 1320' x E2/ft I E2, 640 <br />15 ~ Mob/Demob from Alamosa area ~ 53,680 <br />Subtotal (M): 533,720 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 554,111 <br />]I. INDIRECT COSTS <br />____________ _________ __________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ___ __ <br />Item No.l ICem Description I Cost (5) <br />________I______.,___________________________ <br />1. ~ Public Liability Insurance.... _______ <br />1.550% ___ <br />of ______ <br />dir. ~ ___.,________ <br />5839 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ 8839 <br />3. ~ Contractor's Profit........... 10.OOY. of dir. ~ 55,411 <br />4. I Job Superintendent.. <br />Subtotal (A): E7, 089 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 561,200 <br />0. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.l Item Descri pCi on ~ Cost (E) <br />___..__________________________________.,___________________I___..________ <br />1. ~ Minerals Program Admin. Fee aC 5.007. of cntr.~ 53,060 <br />NET INDIRECT COST PERCENTAGE: 18.76X Subtotal (B ): 53,060 <br /> <br />TOTAL INDIRECT <br />RECLAMATION __________ <br />COSTS (subtotals __ <br />A through B): __________ <br />810,149 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 564,260 <br />