Laserfiche WebLink
RECLAMATION COS~UMMARY cont'd s~ 3 of 4 <br />N. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cos[ (f) <br />________I______________________________..___________________I___.,______ <br />n/a <br />Subtotal (H): <br />____________ <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Lost (S) <br />______________________________________~___________________I____________ <br />n/a <br /> Subtotal (I ): <br />J. EAR THUORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ <br />_ Task Description <br />___ <br />_ <br />___ <br />_______ <br />_ Lost (S) <br />___________ <br />________I <br />10 I <br />_______ <br />________ <br />___________ <br />_________ <br />~ Haul topsoil to pit floor with scraper. ~ 56,201 <br /> Assume 13 ac needing topsoil a 4" avg depth. <br /> Haul from perimeter stockpile. <br />11 ~ Spread topsoil on pit floor with dozer. ~ 53,694 <br /> Assume short pushes, finish grading. <br />12 ~ Spread topsoil on pit slopes with dozer. ~ 5395 <br /> Assume 3 segments of phase slopes need topsoil. <br /> = 1800 LF x 80' slope length a 3:1 gradient x 4" <br /> Push down from perimeter stockpile. <br />________ _________ ____________________________________________ <br />Subtotal (J): ___________ <br />810,290 <br />