Laserfiche WebLink
RECLAMATION COS~MMARY con['d s~t 2 of 4 <br />D. EARTHNORK - FILL COMPACTION <br />Task No.~ Task Description I Cost (E) <br />________I______________________________________________________________ <br />I n/a I <br />Subtotal (D): <br />E. EARTHWORK - RIPPING <br />Task No.l Task Description Cost (E) <br />________I__________________________________________________I___________ <br />7 ~ Rip compacted areas: road, proc area, pit floor. ~ E4,695 <br />Assume level surface. 25 ac Cotal. I <br /> Subtotal (E ): 84,695 <br />F. EARTHWORK - ROAD RECLAMATION <br />Task No.~ <br />________I <br />________ Task Description ~ <br />__________________________________________ <br />_ Cost (E) <br />___________ <br />8 ~ Remove I <br />gravel veneer from roadway. ~ E637 <br /> Assume only partial coverage of road surface. <br /> Gravel moved to pit. <br />13 ~ Roadway grading after gravel veneer removed. ~ E784 <br /> Assume only part of road needing grading. <br /> all road reveg included in task #14 <br />Subtotal (F) E1,421 <br />G. EARTHNORK - FINISH GRADING <br />Task No.~ Task Description ~ Cost (E) <br />________I______________________________..___________________I____________ <br />All finish grading included in topsoil <br />replacement tasks below <br />________________________________________________________________________ <br />Subtotal (G): <br />