Laserfiche WebLink
<br />1 of 4 <br />~orado Division of Minerals and Geology <br />I. DIRECT COSTS =___________ <br />A. EARTHVORK - BACKFI CLING 8 ROUGH GRADING <br />Task No.~ Task Description ~ Lost (E) <br />III IIIIIIIIIIIIIIII <br />RECLAMATION COST SUMMARY FORM ` ,_ <br />_________________ ______________ ''~ .. ''r <br />PERMIT NUMBER M-99 117 PREP. BY: RCO FILENAME: M117-0 ~•~+t ' •~~ ~ ~ ~'"~' ~E! ~ al'° <br />________ ~. ~. .-n <br />.~ ~~.. <br />DATE ********** OPERATION- Colorado Gravel Products Pi[ ~ ~ .. ;~ ~' Lr ol(~~~9 <br />- ;~.-,- <br />PERMIT ACTION New application - final reclamation ~ c.-. ~~G <br />._ <br />_____________________________________________ __ ___ ~ /h' <br />GRAND TOTAL BOND AMOUNT E64,260 j 'C~ <br />__I__________________~_______________________________'____________ <br />2 ~ Crade site where broken debris was removed. ~ E365 <br />Assume 2 ac needing rough grading 6" deep. <br />3 ~ Grade process area and batchi ng area. ~ E2,622 ;~~ryC <br />Assume 8 ac total needing rough grading b" deep. ~ A ~]ll~~ / V~I1 <br />4 I Load and haul broken debris [o pi[ for burial. ~ Eb55, ~"~~G // ~/~4d <br />See demolition costs on task sheet #5. ~ ~'1S/°/! Y v(/ <br />Assume onsite burial as backfill, short haul. ~ °/~Y~F~~ <br />S$Gep~09Y <br />Subtotal (A): E3, 442 <br />B. EAR THL/ORK - HI GHUALL REDUCTION <br />Task No.~ Task Description ~ Cost (E) <br />______________..___________~_______________________.,_______I____________ <br />1 ~ Reduce highwall to 3:1 final gradient. ~ E243 <br />Assume existing 600 LF x 24' ht a 0.5:1 gradient. <br />Subtotal (B ): E243 <br />C. EARTHNORK - NASTE PILE COVER PLACEMENT <br />Task No.~ Task Description <br />________I___________________________________ <br />included in other tasks <br />Cost (E) <br />Subtotal (C ): <br />