My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26603
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:04 PM
Creation date
11/20/2007 6:52:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
1/30/1997
Doc Name
4th Qtr 1996 INSPECTION
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
::. <br />:, <br />~ <br />~ <br />~ .~ ... <br />; <br />, <br />. <br /> <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond 1vu~ ' <br />Date of Inspectio <br />D <br />PDES No. ~iNt~alrl191c'~r,/ g3 <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Moderate, ~ Poor <br />2. Eroston farthing gullies: Extensive, Some, Very w, None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No ~ <br />At the principal spillway inlet? Yes No ~- <br />4. Erosion of the downstream toe of the embankment? Yes No y <br />T!;e cause of the erosion is attributed te: <br />i L seepage occumng dvough :he dam? `."=s _ too ~!- <br />Could this seepage cause oorenuat Instability? Yes Ne___ _ <br />Explain: v~ <br />PRINCIPAL SPILLWAY /1~//~ ~e ~ yrtr t u~ ~'~ ~'~~L- ~~'r~° r Nn~`~ <br />1. Is the principal spillway rysiem In working order? Yes No <br />2. Is the irilet free of debris and restrictive material? Yes No <br />i. Is the discharge outlet free of restncuve material? <br />Yes <br />4. [s erosion occumng at the discharge outlet? Yes <br />Evaluate the severity: Extensive Moderate <br />No <br />No <br />lust Starting None <br />EMERGENCY SPILLWAY <br />1. [s the overall emergency spillway system capable of passing destgn storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosio^ occurring at any section of the emergency spillway? Yes No <br />Describe the extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />If yes, explain: l~i ii1 <br />Yes No ~~ <br />Please add any special comments concerning potentially dangerous problems a^ the back of this <br />sheet! D <br />- Inspected by:~~ )d~y~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.