Laserfiche WebLink
<br />Pond /y.2w <br />Date of Inspecti <br /> <br />-. <br />' <br />~ % <br />~ <br />~ <br />•. . r .. <br />' <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, <br />2. Erosion forming gullies: Extensive, <br />3.. Is wave action causing erosion: <br />Ott the upstream embankment? <br />At the principal spillway inlet? <br />4. Erosion of the downstream toe of the embankment? <br />The cause of the erosion is attributed to: <br />5 1:: ;::^.;pagc orr,:ring th~ou~h she dam? <br />Cott!ri ,~; seepage cause petenu,tl instability? <br />Explain: <br />DES No.~oir(ac, ~~ <br />Few, <br />Very Fe <br />Yes No ci <br />Yzs <br />Yes <br />PRINCIPAL SPILLWAY JY//{9 ~/~e~~„r~~/ ~°r ~o <br />1. Is the principal spillway system to working order? Yes <br />2. Is the irilet free of debris and restrictive material? Yes <br />No. ~~ <br />(,~'Y7 a f h N1P <br />No <br />No <br />3. Is the dischazge outlet free of restrictive material? Yes No <br />d. Is erosion occurring at the discharge outlet? Yes No <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosio^ occurring at any section of thz emergency spillway? Yes No <br />Describe [he extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design sto e capacity of the reservoir been surpassed? <br />If yes, explmn: ~(Z (,/ <br />Please add any special comments concerning potentially dangerous problems on back of this <br />sheet! <br />- Inspected by: <br />Yes No ~ <br />Moderate, Poor <br />Some, None <br />Yes No v <br />Yes No L~ <br />