My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26603
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:04 PM
Creation date
11/20/2007 6:52:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
1/30/1997
Doc Name
4th Qtr 1996 INSPECTION
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />• 1" - <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond iI/~/ ~r~ /d/rN ~ NPDES No. (.", Gr ~ <br />Date of Inspection ~ ~ l,er 7o i y9~ G Jz7 y~~~2 - <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, oderat , Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ery Fey , None <br />3.. Is wave action causing erosion: <br />On the upstream embankment? Yes No ~ <br />At the principal spillway inlet? Yes No <br />4. Erosioo of the downstream toe of the embankment? Yes No y <br />The cause of the erosion is attributed to: <br />Is seepage occuring Ihrou~h [he daiu% . _ ___ ':u_~_ <br />Could ttus seepage cause poten~ial instab~iiw~ )'as __ No_ _ <br />Explain: ~{~- <br />PRINCIPAL SPILLWAY ~1//A Pev„vt~ll~~ ~ T'f~ ~ ~~ aty~t~:~ <br />1. Is the principal spillway rystem to working order? Yes No <br />2. Is the inlet free of debris and restrictive materiah Yes No <br />7. Is the discharge outlet free of restrictive material? Yes No <br />4. Is erosion occumng at the discharge outlet? Yes No <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Does i[ appeaz as if the emergency sptllway has discharged water since the last inspection? <br />Yes No <br />3. Is erosio^ occurring at any section of the emergency spilhvay? Yes No <br />Descnbe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design sto oe c pacity of the reservoir been surpassed? <br />Lfyes, explain: ~~~ (rl <br />Yes No ~~ <br />Please add any special comments concerning potentially dangerous problems on back of [his <br />sheet! <br />Inspected by: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.