Laserfiche WebLink
--~ ~ • <br />CIRCES Cost Estimating Software <br />Agenq or organization name : OMG <br /> <br />Task3: OIa Slate: Cclorado PermiVobll:M-1976-OY7 <br />Date : 11202000 County : La Plata Abbreviation :none <br />User: SSS Sire: Craig Pir Filename: M027-02a <br /> <br />Permit or otherjob action : Technical Revision No. 2 <br /> <br />Task description :Cut and Fill Reduction o/East Hlghwall <br /> <br />HOURLY EQUIPMENT COST Basic machine : Car OBN (1996) Horsepower : 285 <br /> Blade type : Semi-Un/versal <br /> Adachmenl no. 1 : ROPS Cab Shill basis : 1 per day <br /> AHachmenl no. 2 : 3shank dpper <br /> <br /> Utilization Ye Cost data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : Y41.10 NA <br /> Operating cosghour: Y55.64 100 <br /> Ripper op. cosUhour : E1.39 20 <br /> Operator cosUhour : E23.12 NA <br /> Total unit cosUhour : E721.25 Total beet cosUhour : j121.$6 <br />Initial Swell <br />volume: 35, 77B CCY laclor: 1.090 <br />Source of quantity take-oH : TR-002 Exhibit L task no. 3 <br />Source of est. svrell laclor :CAT Handbook <br />HOURLY PRODUCTION <br />Job Condilioi <br />Average push distance: 80 feet <br />Unadjusted hourly production : 922 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradiem . 25.00 % (nag) <br />Average site altitude: 6,720 feet <br />Material weigh) : 2,400 Ibs/LCY <br />Malarial weigh) description <br />Clav and gravel - Drv <br />JOB TIME AND COST <br />Fleet size: / Dozers) <br />Unit cost : $0.202 /LCY <br />Loose <br />volume: 3H.998 LCY <br />Source <br />Operator skill : 0.75 (evg <br />Material consistency : 0.90 (Car l <br />Dozing method : 1.00 (gen <br />Vsibility: 1.00 (avg <br />Jab eRiciency: O.B3 (ishiN~ <br />Spoil pile: O.BO (Ind-, <br />Push gradient: 1.52 (Car! <br />alaaae: 1.00 (cart <br />Material weight: 0.96 (Carl <br />Blade type : 1.00 (S or <br />Net correction : 0.65 <br />Adjusted unit production : 600.50 LCY/hr <br />Adjusted Oeel production : 600.60 LCY/hr <br />Total job time : 64.94 Hours <br />Total job cost : 57,874 <br />