My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60642
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:28 PM
Creation date
11/20/2007 6:47:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976027
IBM Index Class Name
Permit File
Doc Date
11/20/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost EstvnatinD Software <br />SCRAPER-ONLY WORK <br /> Agency or organization name :OMG <br />Task 8 : O3a Slate : Colomrb PeeniVjob s : M-1979.027 <br />Date : 11202000 County : La Plara Abbreviation :none <br />User : SSS Site : Cmip Pit Filename ~ M027-03a <br />Perm it or other job action :Technical Revision No. 2 <br /> Task description : Bac~ll South Phase I Nlghwall <br />HOURLY EQUIPMENT COST <br />Model : Cat 633E (1996) Shia basis : 7 per day <br />Cost Breakdown : Job utilization % Horsepower 475 <br />Ownership cosVhour: $65.79 NA <br />Operating cosphour: Yf05.15 100 Weight (UST): 56.00 <br />Operator cost/hour : f23.30 NA Cosl data source : (CRGf <br />Total unit cosVhour : 8194.25 Total Oeet costlhour : $194.25 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 40.889 CCY factor: 1.110 volume: 45,J87 LCY <br />Scurce of quantity IakebB: TR-002 Exhib/fL task no. 4 <br />Source of estimated swell lector : CAT Handbook <br />HOURLY PRODUCTION <br />Routine CaoaciN <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,800 pounds/LCV Struek volume : NA LCV <br />Material description : Heaped volume : 34.00 LCV <br />Clay-Natural bed Average volume' 34.00 LCY <br />Rated payload: 82,000 pounds <br />Payload capacity : 29.29 LCY Adjusted capaary : 29.29 LCY ^' <br />Cvcle Time (load + haul + soraad + returnl : Loading time : 0.90 minutes - <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : • loading hme per pee on push pull mpdels <br />Route ~ Distance (feet) ~ Grade (%) ~ Roll, res.(%) ~ Tatat res.(%) Velocity ((pm)~ Travel lime (min.) <br />Haul: 600 -B.3 5.0 -3.3 2,1540 0.44 minutes" <br />Return: 600 8.3 5.0 13.3 780 0.92 minutes" <br />"bevel ome atljusted for accelerahon antl tlecelention at loatl antl tlump points <br /> Total cycle time : 2.98 minutes <br />Job Condition Conection Factors <br />Site altitude (lest) : 6,720 <br />Altitude adjustment factor : 0.96 <br />Job efficiency factor : 0.83 <br />Nel jab correction lector : O.BO <br />JOB TIME AND COST <br />Fleet size: f Scraper(s) <br />Adiusted Hourlv Production <br />Unadjusted unit production : 593.21 LCYMOUr' <br />Adjusted unit production : 472.67 LCYMOUr <br />Atljusled Beet production : 472.57 LCYMOUr <br />2 hmes wlume on push-pull motlels <br />Total job lime : 98.02 Hours <br />Unit cost : Y0.4f 7 /LCY Total job cost : $18,852 <br />
The URL can be used to link to this page
Your browser does not support the video tag.