Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />SCRAPER -ONLY WORK <br />PROJECT IDENTIFICATION <br />Agenry or organization name :OMG <br />Task # : 01a State :Colorado PermiVob # : M-1976-027 <br />Dale : 11202000 County : La P/a(a Abbreviation :none <br />User : 555 Site :Craig Prl Filename : M027.Ofa <br />Permit or other job action : Techn/cal Rev/sion Ab. 2 <br />Task description : Batkfill North Hlghwall <br />HOURLY EQUIPMENT COST <br />Model : Caf 633E (1996) Shig basis : 1 per day <br /> <br />Cost Breakdown : Job utilization % Horsepower 475 <br />Ownership cosOhour : 565.79 NA <br />Operating cosUhour : 5105.15 100 Weight (UST): 56.00 <br />Operator cosUhour : 523.30 NA Cost data source : (CRGJ <br />Total unit cosVhour : 5794.25 Total aeet cosVhour : 5194.25 <br />MATERIAL QUANTITIES <br />Initial Swell Loosa <br />volume: 48.@89 CCY factor: 1.110 volume: 54,287 LCY <br />Source of quantity lake-o0 : TR-002 Erhib/f L task no. 2 <br />Source of estimated swell factor : CATHantlbook <br /> <br />HOURLY PRODUCTION <br />Haulino CaoaciN <br />Scraper Payload (weight) Basis : Scraper BovA (volume) Basis <br />Material weight : 2,800 pounds/LCY Slmck volume : NA LCY <br />Material description : Heaped volume : 34.00 LCV <br />Clay - NaNral betl Average volume : 34.00 LCY <br />Rated payload: 82,000 pounds <br />Payload capacity: 29.29 LCV Adjusted capacity: 29.29 LCY'-- <br />Cvcle Time(load+haul+soread+returnl '. Loading time: 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : ' IoaOing bme per pav on push-pull motlels <br />Route ~ Distance (feet) ~ Grade (%) Roll. res.(%) ~ Total res.(%) Velocity (fpm) ~ Tmvel time (min.) <br />Haul : 600 -B.3 5.0 -3.3 2,640 0.44 minutes <br />Return: 600 8.3 5.0 13.3 7B0 0.92 minutes" <br />travel oma atltusted br auelerabon antl deceleration at load antl tlump pomp <br />Job Condition Correction Factors <br />Site aHNude (teal) : 6, 720 <br />Altitude adjustment famor : 0.96 <br />Job ef6cienry lactor : 0.83 <br />Nel job cortection factor : O.BO <br />JOB TIME AND COST <br />Fleet size: / Scraper(s) <br />Total cycle lime 2-96 minutes <br />Adiusied Houdv Production <br />Unadjusted unit production : 593.21 LCY/Hour'-- <br />Adjusled unit pmduction : 472.67 LCY/Hour <br />Adjusted Oeet production : 472.67 LCY/Hour <br />26mes wlume on push-pull models <br />Total job time : 114.81 Hours <br />Unit cost : 50.411 /LCY Total jab cost : S22,J01 <br />