Laserfiche WebLink
CIRCES Cost Estimating Software <br />Permit or other job action : TR-9 <br />Task description : HalUl <br />HOURLY EQUIPMENT COST <br />Model :Cat 621G <br />to refuse pile (current law <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization °h Horsepower : 365 <br />Ownership cosVhour : $37.06 NA Weight (UST) : 35.55 <br />Operating wst/hour : $79.46 100 Cost data source : (CRG) <br />Operator cesUhour : $32.15 NA <br />Total unit cosVhour : ~ $148.68 Total fleet cesUhour : $148.69 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 871 BCY factor : 1.429 volume: 1,244 LCY <br />Source of quantity take-off :6"thick X 1.08 acres (reclamation plan and Map C-6) <br />Source of estimated swell factor : DMG estimate <br />HOURLY PRODUCTION <br />Haulinc Capacity <br />Scraper Payload (weight) Basis : ~ Scraper Bowl (volume) Basis <br />Material description <br />Earth -Dry packed <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Cvcle Time (load + haul + spread + return) <br />Treecl fimw <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity <br />Loading time <br />Maneuver and spreading time <br />'loading time per pair on pearl-pull models <br />17.00 LCY ••• <br />2.00 minutes <br />0.70 minutes <br />Route Distance (feet) Grade (%) Roll, res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 200 0.0 5.0 5.0 1,443 0.24 minutes" <br />Return: 1,100 0.0 5.0 5.0 2,472 0.44 minutes" <br />"Navel time adjusted ror accelerelion and deceleration et load and dump points <br />velocities are max. enaine0le per total rasialence shown, not average <br />Job Condition Correction Factors <br />Site altitude (feet) : 7,400 <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shi/1/day) <br />Net job correction factor : 0.83 <br />Total cycle time 3.39 minutes <br />Adiusted Houdv Production <br />Unadjusted unit production : 300.99 LCY/Hour"' <br />Adjusted unit production : 249.82 LCY/Hour <br />Adjusted Fleet production : 149.82 LCY/Hour <br />2 times volume on pooh-grll modab <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 4.98 Hours <br />Unit cost : $0.595 /LCY Total job cost : $741 <br />Agency or organization name : COMG <br />Task # : 017 State :Colorado PertniVjob # :C-81-035 <br />Date : 0911312005 County : La Plata Abbreviation :none <br />User : TAK Site :King Coal Mine Filename : C035-017 <br />