Laserfiche WebLink
CIRCES Cost Estimation Software <br />PROJECT IDENTIFICATION <br />Task # : 016 <br />Date : 0923!2005 <br />User : TAK <br />State :Colorado <br />County : La Plata <br />Site :King Coal Mine <br />Permitlob# : C-81-035 <br />Abbreviation :none <br />Filename : C035-016 <br />Agency or organization name : CDMG <br />Permit or other job action : TR-9 <br />Task description : ROUg <br />HOURLY EQUIPMENT COST <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.88 NA <br /> Operating cosUhour : $66.09 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $31.78 NA <br /> Total unit cosUhour : $147.75 Total fleet cost/hour : $147.7: <br /> <br /> <br />MATERIAL QUANTITIES _.:: _. <br />Initial Swell Loose <br />098 <br />6 LCY factor : NA volume : 6,098 LCY <br />, <br />volume : <br />Source of estimated volume :3.5'thick X 1. 08 acres (Map G6) <br /> <br />Source of estimated swell factor : NA ,:, ,. <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br /> Operator skill : 0.75 (avg•) <br /> 50 feet Material consistency : 1.20 (Cat HB <br />Average push distance : <br /> 0 LCY/Frc <br />400 <br />1 Dozing method : 1.00 (gen.) <br />Unadjusted hourly production . <br />, <br />: <br /> Visibility : 1.00 (av9~) <br /> Job efficiency : 0.83 (1 shift/da <br />Material consistency description : <br /> Spoil pile : 0.80 ((nd-rQ <br />Loose stockpile 0 (Cat HB <br /> Push gradient : 1.0 <br /> os) <br />00 % ( <br />0 Altitude : 1.00 (Cat Hl3 <br />Average push gradient p <br />. <br />: <br /> 475 feet <br />7 Material weight : 0.79 (Cat HE <br />Average site altitude , <br />: <br /> Blade type : 1.00 (S/SU/L <br />Material weight : 2,900 Ibs/LCY Net correction : 0.47 <br />Weight description <br />50% R <br />k <br />50% Earth <br />Adjusted unit production : <br />663.30 <br />LCY/hr <br />oc <br />, <br />Decomposed rock - <br /> Adjusted fleet production : 663.30 LCYthr <br />J08 TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 9.19 Hours <br />Unit cost : $0.223 /LCY Total job cost: $1,358 <br />