Laserfiche WebLink
Agency or organization name : COMG <br />Permit or other job action : TR-9 <br />Task description : Finssl <br />HOURLY EQUIPMENT COST <br />refuse area <br />Basic machine :CAT 12H <br />Attachment no. 1 : NA <br />current law <br />Attachment no. Z :Multi-shank <br />Horsepower: 140 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cost/hour : $17.98 NA <br />Grader operating costRtour : $24.65 100 <br />Ripper operating wstrhour : $0.00 0 <br />OperatorcasUhcur : $31.97 NA <br />Total unit cosUhour : $74.60 Total fleet cosUhour : $74.60 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 1.06 acres <br />Source of estimated acreage :Map C-6 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees ' ' at 0 Cegrees, bla0e is perpendicular <br />Effective blade length : 10.40 feet to airecaon or bevel. <br />Width of blade overlap per pass : 2,00 feet <br />Net grading or ripping width per pass : 8,40 feet " "width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.2727 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 7,400 feet Altitude adjustment factor : 0.83 ~ {Cat HB) <br /> Job efficiency adjustment factor : 0.85 (fsh/d, mod.) <br /> Net job correction : 0.7055 multiplier <br />Adjusted hourly unit production : 0.8979 acres/hour <br />Adjusted houdy fleet production : 0.8979 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 1.18 hours <br />Unit cost : $83.09 per acre Total job cost : $88 <br />