Laserfiche WebLink
Truck Cycle Time Sheet 3 of 3 <br />Exchange - 0.60 min. Adj. for altitude = 0.60 min, <br />• Load = "0;530 min. = 0:53 min. <br />Maneuver A dump = 1.00 min. = 1.00 min. <br />Travel Time (haul 9 returni~ <br />Hoad cond. descr.:Fitm, smooth, rolling dirt/lt. surfaced road, maintained <br />Haul route <br />Hoad Length Crade Bolling Total Velocity Travel timer <br />seg, f (ft( res.(Xl res.(XI res.(XI (fpm) (mint <br />] 2900 -4,00 3,00 -1.00 3360 0,93 <br />Haul time = 0.93 min. <br />fleturn route ------ <br />1 2400 4.00 3.00 T.00 2743 1,10 <br /> <br /> <br />flat d last seg. adj. for accel,/decal. Heturn time = 1.10 min. <br /> Total Truck Cycle Time = 3.57 min. <br />Loader Unit Prod.. 394.91 LCf/Hr -Adj. for efficiency= <br />........ 327.78 <br />........ LCY/Nr <br />Truck Unit Prod.= 107,12 LCY/Hr -Adj. for efficiency= 68.91 LCY/Nr <br /> Optimal number of trucks per loading unit 4 <br /> Selected number of trucks per loading unit: 4 <br /> Hourly truck team production 355.65 LCY/Hr <br /> Net Hourly TruckJLoader Team Production 327.76 LCY/Hr <br /> Net Nourlp Multiple TIL Team Production 327.76 LCY/Hr <br />• JOB COST : <br /> Fleet sine t T/L Team(s( Total Job Time: <br />........ 78.41 <br />......... Houts <br /> Unit Cost $1.38'l /LCY Tatsl Job Cost: 335,505 <br />