Laserfiche WebLink
HOURLY PRODUCTION: Sheet 2 of 3 <br />................. <br />Job Condition Corrections <br />""" " " " " """ ""' Truck/Load Team Support Bquipment <br />Truck Loader Load Area Dump Area <br />• Alt. = 6,300 ft. .• ....................................... <br />Alt, adjustment ........,., 1,000 1.000 1.000 (.000 <br />Job efficiency ...(lsh/dl 0.830 0.830 0.830 0.830 <br />-------- -------- -------- -------- <br />Net Correotions 0,830 0.830 0.830 0,830 <br />Load Bquipment Capacity <br />Bated capacity 4.250 LCY (nominal heaped] <br />" " " " Fill material description: <br />0ucket fill factor 0.875 Loose material - 1' and over (85-905} <br />Adjusted capacity 3,T 19 LCY <br />Truck Capacity <br />.............. <br />Weight Basis: Volume Basis: <br />Material xeight = 1,600 lbs/LCY Struck capacity = 8,00 <br />Nat, description " "" Heaped capacity = 10.00 <br />Coal - Bituminous, Hax ------- <br />.................................. <br />' Average = .00 LCY <br />Hated payload = 26,000 lbs. "" "' <br />,....., , <br />Payload volume = 16.25 LCY Nax. Avg. Volume = 9.00 LCY <br />• Adj, truck volume based on discreet mo. of loader passes: 7.44 LCY <br />Load Bquipment Cycle Time <br />......................... <br />Numher of discreet loader passes required to fill truck 2 <br />Track loaders- """` <br />Load material description:N/A <br />Bxcavators/Shovels -cycle tine vs, job condition rating: N/A <br />- selected value xithim hasic rating N/A <br />Track loaders -hasic cycle tine elenemts: Load tine = N/A min, <br />Naneuvor time = N/A <br />Dump time = 0.09 <br />Unadjusted Basic Cycle time = 0.500 min. <br />Wheel/Track loaders- <br />Cycle Tiae Factors: Description Factor (min.] <br />--------------- <br />Haterial ------------------------------------------ <br />-Mixed material ----------- <br />0.020 <br />Pile condition -Conveyor or doter piled 10'h and up 0.000 <br />Truck Oxnership -Common ownership of trucks A loaders -0.040 <br />Operation -Constant operation -0.040 <br />Target -Nominal target C,000 <br /> Net cycle time adj. _ -0.060 aia. <br /> Adjusted Basic Cycle Time = - <br />O.S4C ain, <br />Total Icad time per truck incl. exchange time adj,i 0.530 min. <br />t(bulk cf 1st pass completed during truck exchange) " " "` <br />