My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60401
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:18 PM
Creation date
11/20/2007 6:41:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200621711
IBM Index Class Name
Permit File
Doc Date
7/5/2006
Doc Name
NOI Application
From
J.E. Stover & Associates Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geology <br />See page 3 -18 <br />in the enclosed <br />Environmental Assessment, <br />Terror Creek 2D Seismic <br />Survey. <br />• <br />Surface Water <br />See page 3 -13 <br />in the enclosed <br />Environmental Assessment, <br />Terror Creek 2D Seismic <br />Survey. <br />Ground Water <br />See page 3 -14 <br />in the enclosed <br />Environmental Assessment, <br />Terror Creek 2D Seismic <br />Survey. <br />Soils <br />See page 3 -18 <br />in the enclosed <br />Environmental Assessment, <br />Terror Creek 2D Seismic <br />Survey. <br />Vegetation <br />See page 3 -22 <br />in the enclosed <br />Environmental Assessment, <br />Terror Creek 2D Seismic <br />Survey. <br />§2.02.2(2)(d): Period of intended exploration. <br />BRL would like to commence access road and site preparation work no later than August <br />1, 2006. BRL estimates the total time to complete site preparation, drilling and <br />recording at approximately 60 days. <br />Reclamation is expected to require no more than 15 days. To the extent possible <br />reclamation will be contemporaneous with drilling. Hole sealing will be contemporaneous <br />with reclamation at the latest and is estimated to average about one hundred holes per <br />day. Approximately 1,300 shot holes will be drilled. <br />The program is expected to be complete by approximately October 31, 2006. <br />§2.02.2(2)(e): Right to enter surface lands not owned by the applicant. <br />Right to enter USDA -FS and BLM managed lands are presented in Appendices B & C <br />respectively. Right to enter Hughes land is presented in Appendix G. <br />§2.02.2(2)(f): Practices to be followed to protect the environment from <br />adverse impacts as a result of the exploration activities. <br />See page 2 -5 in the enclosed Environmental Assessment, Terror Creek 2D Seismic Survey. <br />§2.02.2(2)(8): Methods to be used to conduct coal exploration and <br />reclamation. <br />See page 2 -2 in the enclosed Environmental Assessment, Terror Creek 2D Seismic Survey. <br />Seed Mixture For Reclamation <br />The seed mixture is contained in the USDA -FS FONSI located in Appendix B. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.