Laserfiche WebLink
n <br />FILLING WELL WITH WATER TO SURFACE AND A FLUID <br />LEVEL MAINTAINED FOR A PERIOD NOT LESS THAN 30 <br />MINUTES. IF WELL BORE INTEGRITY IS COMPROMISED, A 50 <br />FOOT CEMENT PLUG WILL BE PLACED IN END OF WELL <br />BORE AND WELL BORE INTEGRITY RE-TESTED. <br />15. PULL OUT OF WELL, LAYING DOWN DRILL PIPE, MUD <br />MOTORS, AND DIRECTIONAL DRILLING EQUIPMENT. <br />16. RUN UP TO 1400 FEET OF 5-1/2 INCH K-55 FLUSH JOINT LINER, <br />DEPENDING ON LENGTH OF FINAL WELL BORE. LAND LINER <br />WITH LINER HANGER NEAR 7-5/8 CASING SHOE. <br />17. RIG DOWN AND INSTALL SURFACE EQUIPMENT. PREPARE <br />WELL FOR INJECTION. <br />NOTE: IF EXTREME LOSS ZONES ARE ENCOUNTERED, ATTEMPTS <br />WILL BE MADE TO CURE THE HOLE USING AERATED MUD, <br />PERMABLOK (SODIUM SILICATE SOLUTION), POLYMER LCM, <br />TRADITIONAL LCM, AND OR CEMENT. <br />