Laserfiche WebLink
<br />Farmer/Special Use Permit/May 10, 1995/Page 6 <br />5-1602 E. Refund of Excess Payment <br />If the actual cost of repairing road damage caused by a <br />mining operation is found to be less than the amount <br />collected by the County, the County shall refund the <br />difference to the applicant. If the county claims that <br />damage has been done to county roads and has collected <br />funds or materials due to these damages, then those <br />funds and/or materials shall be earmarked for the <br />repair of the specific road(s). Repairs must be <br />completed in a timely manner, or delayed with approval <br />from the operator; if not, these funds or materials <br />must be returned to the operator along with any <br />interest those funds have generated. <br />5-1602 F. Damage to Subject Roads by Other Uses or Weather <br />The mine operator will be respo <br />to subject roads by other users <br />the County in a timely manner. <br />inspect said damage in a timely <br />extent and approximate cost for <br />additional mitigation cost will <br />liability to the operator. <br />~sible to report damage <br />or weather phenomena to <br />The County will then <br />manner and document the <br />its mitigation. This <br />be separate and not a <br />5-1602 G. Repairs to Prevent Further Damage <br />If immediate repairs to the subject roads are necessary <br />to prevent extensive damage for which the operator will <br />be liable, then the operator will request a review by <br />the County. The County will then inspect for said <br />damage in a timely manner, and, if in agreement that <br />said damage needs immediate attention, will then cause <br />repairs to be made; or, with County agreement, the <br />operator will then repair the damage either permanently <br />or temporarily. <br />5-1603 Mitigation of Environmental Impact <br />In the absence of evidence or a finding by the P <br />Commission to the contrary, demonstration that a <br />operation will be conducted in compliance with a <br />environmental assessment approved by appropriate <br />and the State of Colorado Mined Land Reclamation <br />constitute adequate on-site environmental impact <br />lanning <br />proposed mining <br />site-specific <br />Federal agencies <br />Division shall <br />mitigation. <br />5-1604 Enforcement of State and Federal Regulations <br />In the event that the County discovers that applicable state <br />and/or federal regulations pertaining to a specific mining <br />